⊙The self-contained mast is capable of positioning the injector at accurate height.
⊙The crane is not a necessity for operation, eliminating the risk of lifting.
⊙Strengthened mast system with wind load up to class 8 delivers high safety.
⊙The unit can be ready for work within 30 minutes on site, increasing efficiency.
⊙The well control equipment tilting system and advanced connecting reduce work and labor intensity on site.