The project is located in Karachi, Pakistan. It is equipped with 2×4000F(F class) combined cycle gas turbines, and total power is 900MW. The project includes inlet unit, metering unit, filter unit, heating unit, pressure regulating unit and etc. The gas comes from the LNG terminal in the Qasim port. It is an important livelihood project for the local electricity supply in Pakistan. Power plant has started operation since March 2022.