The project is located in Uzbekistan, which is one of the largest combined cycle power plants in Central Asia area. The project is equipped with 2×Mitsubishi M701JAC(H class) combined cycle gas turbines, and total power is 1500MW. It is owned by ACWA POWER. The equipment will be delivered in August 2022.