The project is located in Karachi, Pakistan. It is equipped with 2×4000F(F class) combined cycle gas turbine, and the total power is 900MW. The project includes fine filter unit, start-up heater unit, performance heater unit and outlet separation unit that gas source comes from phase Ⅲ gas regulating & metering station supplied by Jereh. Power plant has started operation since March 2022.