⊙ Simulate CTU operation and working condition based on the arrangement on site and display key component operating status (e.g. BOP, stripper, injector, X-mas tree, tubing string). Jobs can be simulated include gas lift, sand removal, well cleanout, fluid displacement, acidizing, fracturing and fishing.
⊙ CTU rig up/rig down simulation includes stripper installation, BOP & injector lifting, downhole tool string installation/removal, X-mas tree main valve open/close control, tubing purging (N2), removal of pipelines connected to the injector. (More interfaces for customized operation simulation are available).