CTU Simulation Training System

Simulate CTU operation and working condition based on the arrangement on site and display key component operating status (e.g. BOP, stripper, injector, X-mas tree, tubing string). Jobs can be simulated include gas lift, sand removal, well cleanout, fluid displacement, acidizing, fracturing and fishing

Description

Simulate CTU operation and working condition based on the arrangement on site and display key component operating status (e.g. BOP, stripper, injector, X-mas tree, tubing string). Jobs can be simulated include gas lift, sand removal, well cleanout, fluid displacement, acidizing, fracturing and fishing.


⊙ CTU rig up/rig down simulation includes stripper installation, BOP & injector lifting, downhole tool string installation/removal, X-mas tree main valve open/close control, tubing purging (N2), removal of pipelines connected to the injector. (More interfaces for customized operation simulation are available).



Specifications

Voltage

220V 50Hz AC

Power Rating

1,500 W

Ambient Temperature

-20~50

Resolution

Single/splicing 1920*1080, 5400*1920, 3840*1080

Average Non-failure Operation Time

10,000 hours

Dimensions (L×W×H)

90.55"×44.50"×52.16"

Photo Gallery

Data Download

Leave a message

captcha

Related products

Leave a message

Please feel free to contact us at any time.

captcha